Construction costs are $23.50 - 25.00 per square foot for a 60,000 sf
manufacturing facility that typically includes:
-
8" block walls -24 feet height
-
Build-up roof
-
standing seam roof I-60 rate
-
4 - 6" concrete slab 4,000 psi
-
Evaporative cooling in production, and refrigerated cooling in offices,
bathrooms, kitchen and cafeteria areas -Paved parking
-
Interior lighting 70 fc
-
Loading dock doors 1 dock for every 20,000 sf
-
Space heaters (natural gas fed)
-
Electrical power to main panel in plant (internal distribution done by
occupant)
-
Landscaping (varies among builders)
Land in Juárez within industrial parks is between $3.00 and $4.25 per square
foot.